TURKISH DEFENCE INDUSTRY PRODUCT CATALOGUE

539 R ange of 500 and 1000 Pa pressure, external environment air temperature is 30 °C air’s flow is 250- 500 m³/ h, by dried up to 0 °C temperature. The dried and conditioned air is sended required system with smart management system. Testing time is about 72 hour. HIGH PRESSURE AIR CONTROL COMPUTER TEST UNIT F low rate, pressure, temperature and kw capacity units can be controlled seperately, have mount of 1 - 4 exit, are at the control and testing of radar, avionic and electronic circuits. HEAT CONTROL UNIT(1 KW, 2 KW, 3.5 KW, 5 KW,12 KW, 75 KW) S upported by Presidency of Defence Industries, the large cavitation tunnel, assembled at ITU, is going to be an exclusive experimental complex and will serve to the needs of civil and defence industries. Hydrodynamic design studies of the tunnel were carried out by Poland’s CTO together with ITU and the construction work was accomplished by a domestic manufacturer (GÜRDESAN). The tunnel test section, having the dimensions of 5.5m x 1.5m x 1.2m and tunnel max speed of 15 m/s offers a unique test facility to perform cavitation tests, propeller performance tests, wake and boundary layer measurements for surface and underwater vehicles and sensitive hydro-acoustic tests. The tunnel will be recognised as the 7th capable tunnel in the world with respect to the mass flux in the test section. Equipped with sophisticatedmeasuring devices, ITU-CAT will be a large R&D centre with 3000m 2 indoor space. LARGE CAVITATION TUNNEL D estruction laser system’s need of determination temperature, pressure, flow and energy can be controlled by conditioned liquid. The conditioned liquid can be controlled by optional different outputs and values. LASER UNIT TESTING AND ANALYSIS UNIT TEST, MEASUREMENT and CALIBRATION DEVICES

RkJQdWJsaXNoZXIy NDQzMjM=